When blowdown pump is assembled, phreatic water should inspect an item

2023-10-10 08:29:52

Shandong Hairui Zhonglian Pump Industry Co. , ltd. The blowdown pump that is a major produces manufacturer. When type selecting of client blowdown pump, manufacturer of my company water pump can provide the before-sales service such as price of pump of blowdown pump model, blowdown, in order to offer client reference, and manufacturer of my water pump can provide the service of product of custom-built pump industry for the client. This product information is the knowledge that inspects an item about when pump of phreatic water blowdown assembles, answering:

1, of component antirust corrode processing
Before motor of pump of phreatic water blowdown is assembled, answer surface of qualitative component of cast-iron component or each steel, round face undertakes antirust anticorrosion is handled afresh inside the circle outside rotor and stator.
2, the examination of component and clean
Answer phreatic waterBlowdown pumpEach component undertakes electromotor comprehensive examination and clean, the spare parts of attaint and component should undertake repairing by the requirement or change. All qualification just can enter all component be assembled all right.
3, stop what the mouth coordinates a side is sealed
When motor of pump of phreatic water blowdown is assembled, baseplate and the join that carry the component such as the lid stop buccal place should besmear fluid sealant or assemble a requirement to install sealing ring of O form balata by original machine.
4, balata framework oil seal and electromotor axis are extended
Replete grease answers between balata framework oil seal, electromotor axis is extended reach cooperate the surface to should besmear with water pump the intermixture of olefin and vaseline.
5, the control that electromotor axis extends end panel and connection flange position
When motor of pump of phreatic water blowdown is assembled, stop through adjusting push bearing lower adjustment bolt or stop push the spacer measure between bearing bottom space block and base, will assure to dive electromotor axis is extended each other is opposite between end panel and connection flange end panel neat (allow difference is <0.5mm) .
6, the examination of O circle and installation
Motor of pump of phreatic water blowdown is lower O circle should in good condition nondestructive.
7, on stop the control that turns bearing clearance
When motor of pump of phreatic water blowdown is assembled, answer will go up stop push bearing and stop push the clearance between disc to control in 0.5-1mm, in order to restrict phreatic waterBlowdown pumpOf the rotor when electromotor moves go up change quantity. This can be pushed through stopping on control bearing and next guiding bearing between the spacer amount that increases will achieve.
8, the examination with derivative sealed cable
Derivative cable is crossed on the rubber packing ring that guides bearing is in is sealed should reliable, without leakage.
Motor of pump of phreatic water blowdown assembles the cleanness that all parts should hold in the process, do not allow metallic bits, arenaceous bead and other foreign matter to enter interior of phreatic water electromotor absolutely, lest dive,blowdown pump motor runs medium happening to guide bearing is mixed stop those who push bearing is premature wear away to damage even.
Thank you very much to Shandong Hairui Zhonglian Pump Industry Co. , ltd. The visit of official website! Above is the introduction that inspects an item about when pump of phreatic water blowdown is assembled, answering, still think to this problem like you deep one pace understanding, or the problem that has price of model of type selecting of product of other pump industry, water pump, water pump, water pump needs to solve, contact this water pump manufacturer please, my company returns production to suck pump oneself, welcome you at any time seek advice.

WhatsApp